Close Menu
    What's Hot

    Robo.ai Inc. Provides Business Update and Announces Interim Report Release Schedule

    August 20, 2026

    CIMC Modular Building Systems Ships First Modular Hotel Project to Saudi Arabia

    August 20, 2026

    LG ELECTRONICS EXPANDS FIT & MAX SOLUTION ACROSS KEY HOME APPLIANCE CATEGORIES AT IFA 2026

    August 20, 2026
    Iran DispatchIran Dispatch
    • Automotive
    • Business
    • Entertainment
    • Health
    • Lifestyle
    • Luxury
    • News
    • More
      • Sports
      • Technology
      • Travel
    Iran DispatchIran Dispatch
    Home » Bab Gas Cap to increase UAE gas processing by 20 percent by 2026
    Business

    Bab Gas Cap to increase UAE gas processing by 20 percent by 2026

    December 5, 2024
    Facebook Twitter Pinterest LinkedIn Tumblr Email

    MENA Newswire News Desk: ADNOC Gas plc has awarded the Front-End Engineering and Design (FEED) contract for new gas processing facilities at the Bab Gas Cap (BGC) to Worley Engineering Pty Ltd. The project is set to increase ADNOC Gas’ processing capacity by 20%, or over 1.8 billion standard cubic feet per day (scfd). A Final Investment Decision (FID) is expected in 2026. The Bab Gas Cap project is integral to ADNOC’s gas growth strategy, designed to enhance production of natural gas liquids (NGL), condensate, sales gas, and sulfur.

    Adnoc Gas partners with Worley for Bab Gas Cap facility expansion

    The initiative aligns with the UAE’s objective of achieving gas self-sufficiency while reinforcing ADNOC Gas’ global market presence. Dr. Ahmed Alebri, CEO of ADNOC Gas, highlighted the project’s significance, stating, “This milestone has the potential to substantially enhance our gas processing capabilities, unlock additional revenue, and support the UAE’s energy security goals. Utilizing advanced technologies, the BGC project exemplifies ADNOC’s commitment to innovation and sustainability.”

    The design scope encompasses various gas processing facilities, including conditioning units, acid gas recovery, dehydration, sulfur recovery, NGL recovery units, and CO2 capture systems. Additionally, it includes injection facilities, utilities, and the development of pipelines to transport liquid sulfur to the Habshan Sulfur Granulation Plant.

    The facilities will process hydrocarbons from the Bab field, where advanced technologies allow simultaneous extraction of oil and gas. This innovative approach is expected to achieve daily production of 1.5 billion cubic feet of gas and 80,000 barrels of condensate, maximizing both operational and economic efficiency.

    ADNOC’s commitment to state-of-the-art technologies underscores its dedication to sustainable resource management and economic growth. By focusing on optimization and innovation, the BGC project will make a significant contribution to ADNOC’s long-term goals. This project marks a critical step in ADNOC Gas’ journey to expand operations, address rising energy demand, and maintain its reputation as a dependable global energy supplier.

    Related Posts

    South Korea car exports set July high at $6.24 billion

    August 14, 2026

    Global electric vehicle sales rise 9% in July 2026

    August 14, 2026

    Diesel prices climb amid tight US and European fuel supply

    August 12, 2026

    Denmark July CPI rises 1.3% as annual inflation slows

    August 11, 2026
    Latest News

    Magnitude 6.1 quake shakes Indonesia near South Nias

    August 19, 2026

    DRC Ebola outbreak hits record with 2,325 deaths

    August 17, 2026

    DRC malaria toll nears 30,000 deaths after 26 million cases

    August 17, 2026

    Magnitude 5.4 quake hits Gilgit-Baltistan near Sost

    August 14, 2026

    South Korea car exports set July high at $6.24 billion

    August 14, 2026

    Global electric vehicle sales rise 9% in July 2026

    August 14, 2026

    Total eclipse tracks across Russia, Iceland and Spain

    August 13, 2026

    Etihad adds nonstop Abu Dhabi Gothenburg winter flights

    August 13, 2026
    © 2026 Iran Dispatch | All Rights Reserved
    • Home
    • Contact Us

    Type above and press Enter to search. Press Esc to cancel.